Description
SealMaster LV™ is a high performance coal tar emulsion pavement sealer with reduced V.O.C.'s resulting in a more user-friendly product with less irritating fumes. SealMaster LV™ is designed to protect and beautify asphalt pavement surfaces.
Surface Preparation
New asphalt surfaces must cure a minimum of four weeks under ideal weather conditions before application. Surface must be clean and free from all loose material, dirt, and dust. Cracks should be filled with SealMaster® Hot Pour or Cold Applied crack fillers. Treat all grease, oil, and gasoline stains with SealMaster® Petro Seal or Prep Seal.
Mixing Procedures
For optimum results, mix SealMaster LV™ in accordance with the following mix design (based on 10 gallons for ease of calculation):
SealMaster® LV: 10 gallons
Water: 3 gallons
Sand: 30 - 40 lbs.
Mix materials to a uniform consistency.
NOTE: A polymer additive such as Top Tuff or Sealer V.M may be added to mix.
Application
Two coats of mixed material are recommended. Apply by squeegee, brush, or spray. Allow a minimum of 2 to 4 hours drying time before applying second coat. Allow 24 hours before parking cars or allowing traffic over the surface.
Important
Temperatures must be above 50°F both during application and for a period of at least 24 hours after application. Do not apply when rain is imminent or forecast.
Clean Up
Wash tools in water before material dries. |